AI Data Center Integrated Construction Solution

Beta AI DataCenter Turnkey Solution

Turnkey solution from top-level planning to implementation, providing high-performance, localized AI data center solutions.

AI Data Center Integrated Construction Solution

Background

Traditional IDC cannot meet the new requirements of LLMs for power density, cooling and network topology.

Capability Gap

Local governments and leading enterprises want to build AI data centers but lack overall planning and implementation capabilities.

High Knowledge Update & Maintenance Costs

Enterprise knowledge base content changes frequently, traditional solutions require continuous fine-tuning or retraining models, costs remain high.

Solution Content

Turnkey solution from top-level planning to implementation:

Planning

Evaluate computing scale, power requirements, network architecture and expansion space based on 3-5 year business planning, forming technical blueprint and investment estimation.

Infrastructure

Power supply, cooling and airflow organization schemes for high thermal density cabinets, using liquid cooling or hybrid liquid+air cooling to improve PUE indicators.

Computing Zones

Using proprietary servers as core nodes, pre-configured training/inference/storage clusters, unified resource scheduling and management, achieving 'computing as a service' internal operations.

Localization

Provides full-stack solutions centered on proprietary chips, reducing dependence on foreign GPUs and improving supply chain security.

Key Advantages

Let data speak — let results be visible

30%
Energy Efficiency

Liquid cooling reduces PUE below 1.2

100%
Localization Rate

Full-stack domestic equipment available

6 Months
Delivery Time

Fast deployment from planning to production

5 Years
Expansion Plan

Reserved for future computing growth

Technical Capabilities

Deep technical capabilities powering your business

Advanced Cooling

Uses liquid or hybrid cooling supporting high-density cabinets (30-80kW/rack), significantly reducing PUE and operating costs

Smart Resource Scheduling

Unified computing resource pool management with intelligent scheduling for training, inference, and storage scenarios

Secure Architecture

Full-stack solution based on proprietary chips, fully autonomous and controllable from hardware to software

Elastic Scalability

Reserved expansion space based on 3-5 year planning, supporting modular growth for investment protection

Target Industries

This solution is designed for the following industries and use cases

Government
Industrial Campus Management
Research
SOE
Finance
Internet

Implementation Process

Expert-guided implementation ensuring seamless project delivery

01
2-4 weeks
Top-level Planning

Business research and computing needs assessment

02
4-6 weeks
Solution Design

Complete infrastructure, network, and cooling design

03
8-12 weeks
Equipment Procurement

Server, network, and storage equipment delivery

04
6-8 weeks
Construction & Deployment

Room renovation, equipment installation and testing

05
2-4 weeks
Acceptance & Operations

Performance testing, staff training, and production launch

FAQ

Common questions answered

AI data centers differ fundamentally in power density, network topology, and cooling requirements. Traditional IDC cabinets use 5-8kW, while AI training cabinets reach 30-80kW. Networks must support high-bandwidth, low-latency GPU communication (InfiniBand/RoCE). Cooling requires liquid or hybrid solutions. AI data centers also need unified computing resource scheduling, not just server hosting.

Our localized solutions have been successfully deployed in finance and government sectors. Servers based on Huawei Ascend and Hygon DCU chips achieve near-mainstream performance in specific scenarios (inference, CV tasks) with significant advantages in supply chain security and policy compliance. We provide performance evaluations and hybrid deployment recommendations based on your specific scenarios.

Modern liquid cooling technology (cold plate or immersion) is very mature with lower failure rates than air cooling. While initial investment is higher, reducing electricity costs (PUE from 1.6 to below 1.2 saves 25%+ on power), reducing AC equipment and noise means total TCO can be recovered in 3-5 years. We provide 24/7 operations support.

Typical projects take 6-8 months from planning to production. We recommend phased construction: Phase 1 meets current needs (100-200 cards) with 50% expansion space reserved (room, power, cooling); Phase 2 follows actual usage and business growth. This enables quick business validation while avoiding over-investment. We create a 3-5 year expansion roadmap during planning.